History of Six Sigma: From Motorola to Lean Six Sigma

Six Sigma began at Motorola in the 1980s as a way to count and cut defects. Within fifteen years it had become one of the best known management methods in the world. This guide covers the origin of Six Sigma, the people behind it, how General Electric made it famous and how it merged with Lean to become Lean Six Sigma.

The roots: statistical quality control

Six Sigma did not appear from nothing. In the 1920s Walter Shewhart at Bell Laboratories developed the control chart and showed that processes have natural variation. After the Second World War, W. Edwards Deming and Joseph Juran taught statistical methods and quality management in Japan. Japanese manufacturers used these ideas to build a reputation for quality that put heavy pressure on American companies by the late 1970s.

The origin of Six Sigma at Motorola

Motorola was one of the companies under pressure. Under chief executive Bob Galvin, it set out to improve quality across the business. In 1986, Bill Smith, a senior engineer at Motorola, introduced the Six Sigma concept. He linked early product failures in the field to the number of defects found during manufacturing and argued that the company needed a much tougher, common measure of quality.

Smith's measure was defects per million opportunities. A process at six sigma produces no more than 3.4 defects per million opportunities, allowing for the long-term drift of 1.5 sigma that most processes show. Mikel Harry worked with Smith to build the method into a structured approach and to set up Motorola's Six Sigma Institute.

In 1988, Motorola received the first Malcolm Baldrige National Quality Award in the United States. The award gave Six Sigma national attention. Motorola later reported that Six Sigma had saved it more than $17 billion by 2005.

Who is the father of Six Sigma?

Bill Smith (1929 to 1993) is widely called the father of Six Sigma. Mikel Harry is often credited as a co-creator for turning the concept into a teachable method, and Bob Galvin for backing it as chief executive.

GE and Jack Welch make Six Sigma famous

AlliedSignal, led by Larry Bossidy, adopted Six Sigma in the early 1990s. Bossidy encouraged his former colleague Jack Welch, chief executive of General Electric, to try it. In 1995 Welch made Six Sigma a top priority for GE and set the goal of becoming a Six Sigma company by 2000.

GE trained thousands of Green Belts and Black Belts and tied management bonuses to Six Sigma results. GE's 1998 annual report described a return of more than $750 million over its investment that year. Because GE was one of the most admired companies in the world, its results did more than anything else to spread Six Sigma to other industries, including banking, insurance and healthcare.

DMAIC and the belt system

As Six Sigma spread, it settled into a standard structure. Projects follow five phases: Define, Measure, Analyse, Improve and Control (DMAIC). New designs use DMADV. People are trained in a belt system borrowed from martial arts: Yellow Belts join projects, Green Belts lead them part time, Black Belts lead complex projects full time and Master Black Belts coach and run the programme.

From Six Sigma to Lean Six Sigma

At the same time, Lean thinking was spreading from Toyota. The Toyota Production System, developed by Taiichi Ohno and others, focused on removing waste and making work flow. The book The Machine That Changed the World (1990) introduced the term lean production to a wide audience.

Companies soon found that Six Sigma reduced errors but did not always shorten lead times, while Lean sped processes up but did not always fix variation. In the early 2000s the two were combined. Michael George's 2002 book Lean Six Sigma helped popularise the name. Today most training, including ours, teaches the combined method.

Six Sigma timeline

YearEvent
1920sWalter Shewhart develops the control chart at Bell Laboratories
1950sDeming and Juran teach quality methods in Japan
1986Bill Smith introduces Six Sigma at Motorola
1988Motorola wins the first Malcolm Baldrige National Quality Award
1990The Machine That Changed the World popularises lean production
Early 1990sAlliedSignal adopts Six Sigma under Larry Bossidy
1995Jack Welch makes Six Sigma a top priority at GE
2002Michael George's book Lean Six Sigma is published
TodayLean Six Sigma is used in manufacturing, services, healthcare and government worldwide

What the history teaches

Three lessons stand out. First, leadership matters: Six Sigma took off where chief executives such as Galvin and Welch backed it personally. Second, results must be measured in money, which is why sponsors still ask for verified savings. Third, the method keeps evolving. Lean was added, and our own RDMAICS approach adds Recognise and Sustain phases so projects start in the right place and the gains last.

To learn the method itself, start with what Six Sigma is, then try the free White Belt course.

Frequently asked questions

Who is the father of Six Sigma?

Bill Smith, a senior engineer at Motorola, is widely called the father of Six Sigma. He introduced the concept in 1986. Mikel Harry helped turn it into a structured method.

Where did Six Sigma originate?

At Motorola in the United States in 1986, as a way to measure and reduce defects across the company.

Why did GE adopt Six Sigma?

Jack Welch saw the results at Motorola and AlliedSignal and believed Six Sigma could raise quality and profit across GE. He made it a company-wide priority in 1995.

When did Six Sigma become Lean Six Sigma?

In the early 2000s, companies combined Lean's focus on waste and flow with Six Sigma's focus on variation. Michael George's 2002 book Lean Six Sigma helped popularise the name.