Fixed Costs: Definition, Formula and Examples (With Worked Calculations)
Fixed costs are business costs that stay the same in total, no matter how much you make or sell over a period. Rent, insurance and salaries are common fixed cost examples. Knowing your fixed costs helps you set prices, find your break-even point and plan for slow months. This guide explains what fixed costs are, gives fixed cost examples by industry, shows the fixed cost formula with worked examples, and explains how to manage fixed costs.
What are fixed costs?
A fixed cost is a cost that does not change in total when output changes, within a normal range of activity and over a set period. Your monthly rent is the same whether your bakery sells 100 loaves or 1,000 loaves. Fixed costs are predictable, but you must pay them even in a quiet month.
The opposite is a variable cost, such as raw materials, which rises and falls with output.
Fixed cost examples
| Fixed cost | Example | Why it is fixed |
|---|---|---|
| Rent or lease | Office, shop, warehouse or factory rent | Set by the lease, not by sales |
| Salaries | Managers and administration staff on fixed salaries | Paid the same each period |
| Insurance | Public liability, property and professional indemnity | Premium set for the policy period |
| Loan repayments | Equipment finance or business loan | Set by the loan agreement |
| Depreciation | Machinery and vehicles (straight-line method) | Same amount each period |
| Software subscriptions | Accounting, CRM or design software | Flat monthly or annual fee |
| Licences and memberships | Business licences and professional memberships | Flat annual fee |
Fixed cost examples by industry
| Business | Typical fixed costs | Typical variable costs |
|---|---|---|
| Café | Rent, manager salary, insurance, equipment lease | Coffee beans, milk, cups, casual wages |
| Manufacturer | Factory rent, depreciation, salaried staff, loan repayments | Raw materials, packaging, energy used by machines |
| Online retailer | Website platform fees, warehouse lease, salaried staff | Stock, postage, payment fees |
| Consultancy | Office rent, software, insurance, salaried consultants | Travel, subcontractors |
Fixed, variable and semi-variable costs
| Type | Total cost as output rises | Cost per unit as output rises | Example |
|---|---|---|---|
| Fixed | Stays the same | Falls | Rent |
| Variable | Rises | Stays the same | Materials |
| Semi-variable (mixed) | Rises, from a fixed base | Falls, then levels out | Electricity with a fixed supply charge plus usage |
| Step-fixed | Fixed, then jumps at a capacity limit | Varies | Adding a second supervisor when a night shift starts |
The fixed cost formula
There are two common ways to find fixed costs:
- Add them up: total fixed costs = the sum of all costs that do not change with output.
- Work back from total cost: fixed costs = total cost − (variable cost per unit × units produced).
Then, fixed cost per unit = total fixed costs ÷ units produced.
Fixed cost with example: a small manufacturer
Precision Components is an illustrative small manufacturer of metal parts. Its monthly fixed costs are:
| Fixed cost | Monthly amount |
|---|---|
| Factory rent | $4,500 |
| Equipment lease | $2,200 |
| Salaried staff (3 managers, 2 administration) | $18,000 |
| Insurance | $1,800 |
| Equipment loan repayment | $3,500 |
| Software subscriptions | $850 |
| Utilities (fixed supply charges) | $600 |
| Depreciation on owned machinery | $2,100 |
| Total | $33,550 |
At 5,000 units a month, fixed cost per unit = $33,550 ÷ 5,000 = $6.71. At 8,000 units a month, it falls to $33,550 ÷ 8,000 = $4.19. Spreading fixed costs over more units is one reason higher volumes can lower unit costs.
Worked example: finding fixed costs from total cost
An illustrative workshop has total monthly costs of $50,000. It makes 2,000 units, and the variable cost is $15 per unit.
- Variable costs = $15 × 2,000 = $30,000.
- Fixed costs = $50,000 − $30,000 = $20,000.
- Fixed cost per unit = $20,000 ÷ 2,000 = $10.
Using the high-low method
If you only know total costs at two output levels, the high-low method splits them into fixed and variable parts. Illustrative data:
| Month | Units | Total cost |
|---|---|---|
| Low month | 1,000 | $35,000 |
| High month | 3,000 | $65,000 |
- Variable cost per unit = ($65,000 − $35,000) ÷ (3,000 − 1,000) = $30,000 ÷ 2,000 = $15.
- Fixed costs = $65,000 − ($15 × 3,000) = $65,000 − $45,000 = $20,000.
- Check with the low month: $35,000 − ($15 × 1,000) = $20,000.
Fixed costs and break-even analysis
Fixed costs drive the break-even point, the sales volume where total revenue equals total cost.
Break-even units = fixed costs ÷ (selling price per unit − variable cost per unit).
For Precision Components, with a price of $25 and a variable cost of $12 per unit: $33,550 ÷ ($25 − $12) = $33,550 ÷ $13 = 2,580.8, so it must sell 2,581 units a month to break even. Each unit above that adds $13 of profit.
How to manage and reduce fixed costs
- Review fixed costs every quarter. Cancel subscriptions and services that no longer add value.
- Renegotiate contracts. Ask landlords, insurers and suppliers for better terms at renewal.
- Turn some fixed costs into variable costs. Use contractors, shared spaces or pay-per-use services where demand is uncertain.
- Use capacity well. Higher use of the same equipment and space spreads fixed costs over more output.
- Test big commitments. Before signing a long lease or loan, check demand forecasts and the new break-even point.
How fixed costs link to process improvement
Lean Six Sigma helps you get more value from the fixed costs you already carry. When waste and rework fall, the same space, equipment and salaried staff produce more good output, so fixed cost per unit drops.
For example, if Precision Components cuts scrap and downtime so that good output rises from 5,000 to 5,500 units with the same fixed costs, fixed cost per unit falls from $6.71 to $33,550 ÷ 5,500 = $6.10.
Our Lean Six Sigma Yellow Belt online training teaches you to find this kind of waste. The Green Belt teaches you to lead cost reduction projects with data.
Frequently asked questions
What are fixed costs?
Fixed costs are expenses that stay the same in total regardless of how much you produce or sell over a period, such as rent, insurance, salaried wages, software subscriptions and loan repayments.
How do you calculate total fixed costs?
Add up every cost that does not change with output for the period. If you know total cost and variable cost per unit, you can also use: fixed cost = total cost minus (variable cost per unit × units produced).
What is an example of calculating fixed cost?
A workshop has total monthly costs of $50,000 and makes 2,000 units at a variable cost of $15 each. Variable costs are $30,000, so fixed costs are $50,000 minus $30,000 = $20,000 a month.
How do you calculate fixed cost per unit?
Divide total fixed costs by the number of units. Using the example above, $20,000 divided by 2,000 units is $10 per unit. Fixed cost per unit falls as volume rises.
What is the difference between fixed and variable costs?
Fixed costs stay the same in total as output changes. Variable costs, such as materials and packaging, rise and fall with output.