Quality Assurance vs Quality Control: Differences and Examples

Quality assurance (QA) and quality control (QC) are often used as if they mean the same thing. They do not. QA is about preventing defects by building good processes. QC is about finding defects by checking the output. Strong organisations need both.

Definitions

The ISO 9000 quality management vocabulary describes both as parts of quality management. Quality assurance focuses on providing confidence that quality requirements will be met. Quality control focuses on fulfilling quality requirements, mainly by checking products and services.

Quality assurance vs quality control

Quality assurance (QA)Quality control (QC)
AimPrevent defectsFind and correct defects
FocusThe processThe product or service
TimingBefore and during the workDuring and after the work
Typical activitiesProcedures, training, audits, process design, supplier approvalInspection, testing, sampling, checklists, control charts
ResponsibilityEveryone, led by managementInspectors, testers or the operators themselves

Examples

  • Food manufacturing: QA writes the hygiene procedures and trains staff. QC tests samples from each batch for contamination.
  • Software: QA sets coding standards and review processes. QC runs tests on each release.
  • Healthcare: QA designs a medication safety checklist. QC audits a sample of patient charts each month.
  • Call centre: QA builds scripts and training. QC scores a sample of recorded calls.

Common QA and QC tools

Quality assurance toolsQuality control tools
Standard operating procedures and work instructionsInspection and test plans
Training and competency checksAcceptance sampling
Process FMEACheck sheets
Error-proofing (poka-yoke)Control charts
Internal audits and supplier approvalGauges and measurement checks

How QA and QC fit into Lean Six Sigma

In a DMAIC project, the Improve phase usually strengthens quality assurance: the team redesigns the process, adds error-proofing and writes new standard work. The Control phase sets up quality control: a control plan, control charts and audits that confirm the gains hold. A project that adds only extra inspection has treated the symptom, not the cause.

What does CQI mean?

CQI stands for continuous quality improvement. It is common in healthcare and education. Where QA sets the system and QC checks the output, CQI uses the data from both to keep improving the process, usually through Plan, Do, Study, Act cycles. Lean Six Sigma is one structured way to carry out CQI.

Why prevention beats inspection

Inspection catches defects after the cost of making them has already been spent, and it never catches every one. Building quality into the process stops defects from happening. That is why Lean Six Sigma projects aim to fix root causes and add error-proofing, then use QC checks and control charts to confirm the process stays in control. Our cost of poor quality calculator shows how much failures cost compared with prevention.

Frequently asked questions

What is the difference between quality assurance and quality control?

Quality assurance prevents defects by building good processes, training and procedures. Quality control finds defects by inspecting and testing the output.

Is QA or QC more important?

Both are needed, but prevention through QA is usually cheaper than finding defects through QC. QC confirms that QA is working.

What does CQI stand for?

Continuous quality improvement: an ongoing cycle of measuring, analysing and improving processes, widely used in healthcare and education.

Is quality control part of quality assurance?

They are separate parts of quality management. QA covers the system that prevents defects, and QC covers the checks that detect them.