Lean Six Sigma Formula Toolkit
Lean Six Sigma Formula Toolkit
Pair it with an online certification course
The Lean Six Sigma Formula Toolkit
Your software gives you the answer. This shows you where it came from. 227 Lean Six Sigma formulas worked step by step in project order, from COPQ and DPMO through Cp, Cpk, Gage R and R, hypothesis testing and regression, to control limits, Weibull and multi year ROI. Every calculation includes the dataset, the notation with a full symbol legend, the substitution line by line, the chart and a plain explanation of what the number means.
You get both formats. Seven reference decks for use during a live project, and the 1,002 page companion handbook that teaches the reasoning behind every one of the 227 formulas. Both are included in the one price.
Get the toolkit, AUD $499 See how a formula is explained Sample slide Define / Formula 02 Formula, legend and reasoning Page 9 of 31 227Formulas worked 7Phases covered 1,746Pages, decks and book 1Continuous projectRDMAICS, not DMAIC
Two phases most references skip. Recognise sizes the problem in money before anyone commits, and Sustain proves the gain held years later. Every formula sits in the phase that actually uses it.
RRecognise7 formulas DDefine8 formulas MMeasure43 formulas AAnalyse49 formulas IImprove49 formulas CControl41 formulas SSustain30 formulas227 formulas · 45 lenses · 744 deck pages · 1,002 book pages · one continuous project
The software hides the part that matters
You open Minitab, load the data and click. A Cpk appears. You put it in the report. Then the sponsor asks why Cpk and Ppk disagree, or whether the sample was big enough, or what happens if the process is not normal, and the button cannot answer any of that.
This is the gap that catches Belts out. Running the calculation is the easy part and the software has made it trivial. Understanding what the formula assumed, which numbers went into it, and what the output actually licenses you to claim is the hard part. No calculator will teach you that, and neither will a formula sheet.
This toolkit opens up every formula and shows the working. Not a cheat sheet. Every calculation arrives with the business reason it was needed, the raw dataset, the notation with each symbol defined in plain language, the substitution line by line, the chart, an interpretation, and a short explanation of the thinking behind the method. After reading it you can run the number and defend it.
How every formula is explained
The same four part template runs through all 227 calculations, so once you learn to read one you can read every one.
PART 1Scenario background
Why the team needed this calculation at this point in the project, and what decision hangs on the answer.
PART 2Dataset
The raw numbers in a clean table with the source stated, so every input can be traced back.
PART 3Formula and legend
Stacked mathematical notation with every symbol defined underneath in plain language.
PART 4Calculation and meaning
The substitution shown line by line, a result box, a chart, and what the team did next.
Every formula carries a Why It Matters panel
This is the part software cannot give you and other references leave out. Not what the formula is, but why it is built that way, and what goes wrong when people use it without knowing. Three examples taken straight from the decks.
STAKEHOLDER MATRIXWhy you multiply, not add
Multiplying power by interest is deliberate. A stakeholder with total authority and no interest scores low, which is correct. Adding would promote them into daily management they neither want nor need.
KANO MODELWhy two response types are dropped
Reverse and Questionable responses are excluded from both denominators. They describe survey noise rather than customer preference, so including them would understate every coefficient.
PARETO CHARTWhy sorting comes first
Sorting descending before accumulating is not cosmetic. The formula only identifies a vital few if the largest categories are counted first, which is why an unsorted Pareto chart is meaningless.
QFD MATRIXWhy the scale jumps 9, 3, 1, 0
The scale is not linear by accident. The wide spacing forces the team to distinguish a strong relationship from a moderate one instead of scoring everything in the middle.
CUSTOMER EFFORT SCOREWhy the mean can mislead
CES is a simple mean, so it hides the shape of the distribution. Always read the score next to the histogram, because two very different customer experiences can average to the same number.
PROJECT Y GAPWhy you quote both numbers
The gap in percentage points is what the process must physically deliver. The percent improvement is what leadership hears. Quoting only one of the two is how projects commit to the wrong thing.
Six slides from the decks
Taken straight from the toolkit, unedited. Each formula runs across two slides, the notation with its reasoning, then the calculation with the chart and what the team concluded. Click any slide to view it full size.
Slide image not loadedThe six slide images are embedded in this block.MEASURE, FORMULA 10Process capability Cp. The formula, every symbol defined, and the reasoning behind it. Slide image not loadedThe six slide images are embedded in this block.MEASURE, FORMULA 10The same formula one slide later. Calculated, charted against the spec window, interpreted. Slide image not loadedThe six slide images are embedded in this block.ANALYSE, FORMULA 14Pareto cumulative percentage worked step by step, with the 80 percent line. Slide image not loadedThe six slide images are embedded in this block.CONTROL, FORMULA 15OC curve. What a sampling plan accepts, and what it quietly lets through. Slide image not loadedThe six slide images are embedded in this block.IMPROVE, FORMULA 19Number of operators required, work content measured against takt. Slide image not loadedThe six slide images are embedded in this block.ANALYSE, FORMULA 32Chi square goodness of fit. Formula, legend, and why the test matters. 1 / 6The Complete Lean Six Sigma Formula Handbook, 1,002 pages
The decks are the reference you open during a project. The handbook is the book that teaches you the reasoning. Every one of the 227 reference pages is reproduced at full print resolution, and underneath each one sits the explanation the slide had no room for. Both come with your purchase.
1,002Pages 227Formulas explained 227Practice questions 7Chapters, one per phase CHAPTER 1, PAGE 08The reference page on top. Underneath, why the formula is only a sum, how to read each term, and the one to ten to one hundred principle. CHAPTER 1, INTERPRETING THE RESULTEvery formula closes with a full page. Benchmarks, a sensitivity test on the softest input, the errors that survive review, and a practice question with its answer.What the book adds that a slide cannot
The reasoning, not just the methodWhy COPQ has no weighting term. Why net benefit sits in the ROI numerator and gross benefit inflates the figure from 200 percent to 300 percent without a single number changing on the ground. Benchmarks for every resultWhat good looks like, and where this business sits against it. Prevention above 25 percent of COPQ. External failure below 25 percent. You get the yardstick, not only the number. Sensitivity testingEvery estimate gets stress tested in print. Halve the softest input, double it, and see whether the decision still holds. Run the test before your sponsor does. The errors that survive reviewThree named mistakes per formula, the ones that pass a tollgate and surface six months later. Counting only rework and calling it COPQ. Leaving an estimate at zero because it is an estimate. 227 practice questions with answersEvery formula closes with a check yourself question and its worked answer. Together they form a ready made problem set for exam preparation or for teaching. Print resolution reference pagesAll 227 reference pages are placed at 389 dpi across the full text width, so the book reads and prints as cleanly as the decks project.What sits under every formula
01The judgement inside each symbol. What the notation is actually asking you to decide. 02What the result tells you. The number, then the shape of the number. 03Benchmarks. What good looks like, and where this business sits. 04Testing the softest input. Stress the estimate before it is published. 05Errors that survive review. The mistakes that pass a tollgate. 06What to do with it. The decision the number licenses. 07Where the number returns. Which later phase inherits this figure. 08Practice. A question and its answer, every time.| Chapter | The question the phase settles | Formulas | Book pages |
|---|---|---|---|
| 1. Recognise | Is there a problem worth fixing, and what does it cost | 7 | 1 to 39 |
| 2. Define | What exactly are we fixing, and what does the customer want | 8 | 40 to 80 |
| 3. Measure | How bad is it, and can the data be trusted | 43 | 81 to 263 |
| 4. Analyse | What is actually causing it, and is the evidence real | 49 | 264 to 471 |
| 5. Improve | What change works, and by how much | 49 | 472 to 679 |
| 6. Control | Will the gain hold once the team moves on | 41 | 680 to 855 |
| 7. Sustain | Did it still hold two years later | 30 | 856 to 986 |
Front matter runs i to xix and covers the master scenario, the RDMAICS framework, symbols and conventions, and how every number was checked. Back matter carries the reference tables. Delivered as PDF alongside the seven decks.
Which Lean Six Sigma formulas are covered?
All of them, in the order a project uses them. The financial formulas include cost of poor quality, return on investment, net present value and multi year benefit realisation. The defect and yield formulas include defect rate, DPU, DPO, DPMO, PPM, first pass yield, rolled throughput yield and sigma level conversion.
Process capability is covered in full, with Cp, Cpk, Pp, Ppk and Cpm, alongside Z scores and the normal distribution. Measurement system analysis covers Gage R and R, repeatability, reproducibility, number of distinct categories and attribute agreement with Kappa. Sampling covers sample size, confidence intervals, margin of error and statistical power.
The statistical testing set runs from one and two sample t tests, paired t tests and Welch, through proportion Z tests, one way and two way ANOVA, chi square, F tests, and the non parametric alternatives including Mann-Whitney, Kruskal-Wallis and Mood's median. Relationships are covered with correlation, simple and multiple regression, R squared and residual analysis.
Lean formulas include takt time, cycle time, lead time, Little's Law, process cycle efficiency, OEE, TEEP, line balance efficiency, EOQ, reorder point and kanban sizing. Experimentation covers full and fractional factorial design, main effects, interactions, Taguchi signal to noise, the loss function and response surface methods.
Control covers X bar R, X bar S, individuals and moving range, EWMA, CUSUM, p, np, c and u charts, control limit calculation, Western Electric and Nelson rules, average run length, OC curves, AQL, LTPD and acceptance sampling. Reliability adds MTBF, MTTR, availability and Weibull. Sustain closes with drift detection, learning curves, maturity scoring and diffusion modelling.
All 227 formulas, phase by phase
Formulas appear in the order a real project uses them, not alphabetically. Each phase groups its calculations into lenses, and opens by carrying forward the numbers the previous phase produced.
RPhase 1 of 7Recognise
7 formulas / 30 deck pages / 39 book pages / 4 lensesBefore a project is chartered, leadership needs a number. This phase converts four warning signals into a dollar figure, ranks the candidate projects against agreed criteria, and establishes the customer baseline from three independent angles.
COPQ, four bucketsROIWeighted project selectionDefect rateComplaint rateNPSCSATWhat Recognise covers
01Financial Sizing. Quantifies the dollar problem and the case for action. 02Project Triage. Picks the highest leverage candidate from a portfolio. 03Operational Health Check. Measures how often things go wrong on the floor. 04Customer Voice. Triangulates dissatisfaction from three angles. DPhase 2 of 7Define
8 formulas / 31 deck pages / 41 book pages / 5 lensesThe phase that turns a signal into a contract. It locks the project Y, sizes the gap, sets a target anchored in evidence rather than ambition, ranks what the customer actually wants, and translates that into process inputs the team can adjust.
Project Y gapGeorge Group 70%CTQ weighted scoreKano Better and WorsePower times interestPareto cumulativeQFD technical importanceCustomer Effort ScoreWhat Define covers
01Goal Setting. Locks the project Y and sets a SMART target. 02Voice of Customer. Turns customer wants into rankable requirements. 03Stakeholder Strategy. Maps who is managed, satisfied, informed or monitored. 04Vital Few Diagnostic. Finds the failure modes driving most of the defects. 05Technical Translation. Converts CTQs into controllable process inputs. MPhase 3 of 7Measure
43 formulas / 138 deck pages / 183 book pages / 7 lensesBuilding a baseline leadership can defend. Defect metrics, capability, the distribution theory underneath both, then an audit of the measurement system itself before any of it is trusted. Flow and equipment effectiveness close the phase.
DPU, DPO, DPMO, PPMFPY and RTYSigma levelCp, Cpk, Pp, Ppk, CpmZ score and normal curveGage R and RKappa and ndcSample size and CITakt, cycle, lead timeLittle's LawOEE and TEEPWhat Measure covers
01Defect Metrics. Converts the headline defect rate into operational metrics. 02Process Capability. Tests whether the spread fits inside the spec limits. 03Distribution Theory. Sets the foundation under capability and intervals. 04Descriptive Statistics. Characterises centre, spread and shape. 05Measurement System. Audits the data system before it is trusted. 06Sampling and Confidence. Sizes plans and converts statistics into ranges. 07Time, Flow and OEE. Takt, cycle, lead, WIP, throughput and equipment. APhase 4 of 7Analyse
49 formulas / 157 deck pages / 208 book pages / 7 lensesThe largest phase in the toolkit. It confirms that observed differences are real rather than sampling noise, quantifies which inputs actually move the output, ranks the causes, then prices every finding so the Improve queue is ordered by money rather than opinion.
One and two sample t testsPaired t and WelchProportion Z testsOne and two way ANOVAChi squareF testMann-WhitneyKruskal-WallisSimple and multiple regressionR squared and residualsFMEA and RPNCohen's dFault tree analysisPower and sample sizeWhat Analyse covers
01Parametric Tests. Confirms differences are real, not sampling noise. 02Distribution Tests. Robust alternatives when normality is in doubt. 03Regression. Quantifies driver strength and predictive power. 04Risk and Prioritisation. Ranks the vital few causes for the Improve queue. 05Effect and Intervals. Sizes practical significance, not only statistical. 06TOC and Waste. Translates every finding into dollars. 07Power and Fault Trees. Confirms test reliability and joint failure logic. IPhase 5 of 7Improve
49 formulas / 157 deck pages / 208 book pages / 7 lensesDesigning the change, testing it and proving the gain landed. Full experimental design through to response surface optimisation, alongside the lean formulas that size pull systems, balance a line and evaluate capital at the bottleneck.
Full and fractional factorialMain effects and interactionsTaguchi signal to noiseTaguchi loss functionKanban and safety stockROP and EOQSMED and heijunkaLine balance efficiencyNumber of operatorsPICK and Pugh matrixCentral compositeBox-BehnkenDrum buffer ropeWhat Improve covers
01Design of Experiments. Quantifies factor effects, interactions and curvature. 02Taguchi Methods. Combines level and consistency, then prices deviation. 03Lean Inventory. Sizes pull, reorder points, safety stock and order quantity. 04Line Balancing. Sizes staffing, exposes imbalance, benchmarks flow. 05Solution Selection. Triages candidate changes, then proves the gain. 06Response Surface. Fine tunes the optimum with quadratic models. 07Constraint Elevation. Evaluates capital investment at the bottleneck. CPhase 6 of 7Control
41 formulas / 133 deck pages / 176 book pages / 8 lensesHolding the gain and proving it holds. Every chart type with its limit calculations, the rules that decide which patterns count as signals, then acceptance sampling, equipment reliability and the money case for keeping the control plan funded.
X bar R and X bar SIndividuals and moving rangep, np, c and u chartsControl limit calculationWestern Electric rulesNelson rulesAverage run lengthEWMA and CUSUMOC curvesAQL and LTPDMTBF and MTTRWeibullPAF cost of qualityNPVWhat Control covers
01Variables Charts. Charts for measured values, subgroups to short runs. 02Attributes Charts. Counted defects and defectives, fixed or varying n. 03Signal Rules and Sensitivity. Which patterns count, and how fast each reacts. 04Advanced and Specialty. Memory charts, trend charts, lines with no history. 05Sustained Capability. Proof capability and discipline survived handover. 06Reliability and Equipment. Failure rate, availability, hazard shape, replacement. 07Acceptance Sampling. What a plan lets through, and when to stop inspecting. 08Financial Sustainment. The money case for funding the control plan. SPhase 7 of 7Sustain
30 formulas / 98 deck pages / 131 book pages / 7 lensesThe phase almost nobody teaches. It detects whether the gain is quietly eroding, compounds the benefit across years for capital decisions, scores programme maturity, and measures the people, knowledge and change factors that decide whether any of it lasts.
Mann-Kendall and Sen's slopeMulti year ROI and CAGRLife cycle costMaturity scoring5S sustain and LPAeNPS and Gallup Q12Ebbinghaus forgetting curveWright's learning curveKirkpatrickADKARHoshin X matrixAHP consistencyBass diffusionCrow-AMSAAWhat Sustain covers
01Long Term Capability. Detects whether Improve gains hold or erode. 02Long Horizon Economics. Compounding benefit and life cycle cost for capex. 03Maturity and Sustainability. Composite measures of programme maturity. 04People and Engagement. The cultural underpinning of a sustained programme. 05Knowledge and Learning. Forgetting, learning, skill matrix and reuse. 06Change and Strategy. Training evaluation, readiness and deployment. 07Replication. Spreading a proven fix to other sites and lines.One project runs through all 227 formulas
Every formula is worked on Tony's Pizza Co., a fictitious quick service business in Brunswick, Melbourne. Not because pizza is clever, but because everybody can picture the process, and because the numbers can then carry forward without needing a new context every chapter.
Outputs become inputsThe CTQ weights calculated in Define feed straight into the QFD matrix five formulas later. Change a weight upstream and every downstream priority moves. Nothing resetsThe 4.49 percent baseline set in Recognise is still the reference point in Sustain, five years of project life later. Uncomfortable results stay inMeasure found the measurement system itself was weak. The decks show what the team did about it rather than quietly fixing the data. No software requiredEvery calculation is shown by hand, so you can reproduce any of it in Excel and check the software you normally trust. Australian dollarsAll currency figures are AUD, with the calculations transferable to any currency.The project, phase by phase
Recognise: cost of poor quality$100,000 / yr Recognise: baseline defect rate4.49% Define: SMART target, 6 months2.19% Measure: process sigma3.93 σ Measure: DPMO7,465 Improve: achieved defect rate2.10% Improve: annual benefit$251,472 Control: sustained Cpk2.42 Sustain: five year ROI1,700%Who uses the toolkit
Belts who use the software
You can run Minitab, JMP or Sigma Magic. You want to know which formula it applied and what it assumed, so the next question from a sponsor does not stop you.
Belts studying for certification
Exams give you numbers and ask for an answer. Working every formula on real data beats memorising a formula sheet you will forget by the exam, and the handbook adds 227 practice questions with answers.
Belts running a live project
You are mid phase and need the right calculation now, with a worked example and the reasoning beside it.
Trainers and coaches
A consistent teaching set across all seven phases, so your examples stop contradicting each other from one session to the next. Project from the decks, prepare from the book.
Process improvement teams
A shared reference so everyone calculates Cpk, DPMO, sigma level and control limits the same way, with the same assumptions.
Quality and reliability engineers
Control and Sustain cover MTBF, Weibull, acceptance sampling and reliability growth, which most Lean Six Sigma references skip entirely.
The complete toolkit, sold as one
Phases are not sold separately. Each one carries forward the numbers from the phase before it, so the toolkit only works read as a whole. The 1,002 page handbook is included at no extra cost.
Complete toolkit plus handbookThe Lean Six Sigma Formula Toolkit
AUD $499SEVEN DECKS PLUS THE 1,002 PAGE BOOK- 227 formulas worked across 744 pages of reference decks
- The Complete Lean Six Sigma Formula Handbook, 1,002 pages, included
- All seven RDMAICS phases, Recognise to Sustain
- Concept, dataset, notation, calculation, chart and interpretation for every formula
- A Why It Matters panel on every formula
- Benchmarks, sensitivity tests and common errors for every formula in the book
- 227 practice questions with worked answers
- Free updates to future editions
- Instant PDF download of the seven decks and the handbook
SECURE CHECKOUT · INSTANT PDF DOWNLOAD
What is inside the toolkit
| Volume | Phase | Formulas | Pages | Lenses |
|---|---|---|---|---|
| 1 | Recognise | 7 | 30 | 4 |
| 2 | Define | 8 | 31 | 5 |
| 3 | Measure | 43 | 138 | 7 |
| 4 | Analyse | 49 | 157 | 7 |
| 5 | Improve | 49 | 157 | 7 |
| 6 | Control | 41 | 133 | 8 |
| 7 | Sustain | 30 | 98 | 7 |
| Decks | Complete RDMAICS | 227 | 744 | 45 |
| Book | The Complete Formula Handbook | 227 | 1,002 | 45 |
| Total | Everything included | 227 | 1,746 | 45 |
All prices in Australian dollars. Delivered as PDF, immediately after purchase.
Training and team licences
The standard price covers one reader. If you want to distribute copies inside your organisation, or teach from these decks in your own training, a team or trainer licence covers it.
Enquire about a team licenceFrequently asked questions
Do I need statistics training to use this?No. Every formula includes a symbol legend in plain language, a written interpretation of the result and an explanation of the reasoning behind the method. If you can read a table, you can follow the calculations. A Green Belt or Black Belt background makes it faster, but it is not assumed.
What is the difference between the decks and the handbook?The seven decks are the working reference. One formula, its dataset, its notation and its calculation, sized to project on a screen or read on a tablet during a live project. The handbook reproduces all 227 reference pages at print resolution and adds the teaching underneath each one. Benchmarks, sensitivity testing, the errors that survive review, what to do with the result, and a practice question with its answer. Same numbers, same project, more depth.
Is the handbook an extra cost?No. The 1,002 page handbook is included in the AUD $499 price alongside the seven decks. You receive both in the same download.
Which software do I need?None. Every calculation is shown by hand so you can reproduce it in a spreadsheet. Nothing depends on Minitab, JMP, Sigma Magic or any paid statistical package. The point of the toolkit is to explain which formula the software applies and what it assumes when you press the button.
Can I buy just one phase?No. The toolkit is sold complete. Every phase carries forward the numbers calculated in the phase before it, so one phase read in isolation loses the context that makes the worked examples useful. Buying the set also means the answer to any phase question is always in front of you.
How long is the complete toolkit?More than 740 pages across the seven decks, plus a 1,002 page handbook, covering 227 formulas. Analyse and Improve are the largest at 157 deck pages and 49 formulas each. Recognise is the shortest at 30 deck pages and 7 formulas.
Does the handbook include practice questions?Yes. Every formula closes with a check yourself question and its worked answer, which gives you 227 questions in total. They are written to test whether you understood the reasoning rather than whether you can repeat the arithmetic.
Is this the same content as your online courses?No. The courses teach the method through video lessons. This toolkit is the calculation reference you keep beside you while running a project or preparing for an exam. Many learners use both, and the numbers are consistent with the training material.
Does it go beyond standard DMAIC?Yes. The toolkit follows RDMAICS, which adds a Recognise phase before Define and a Sustain phase after Control. Control includes acceptance sampling, OC curves, Weibull reliability and cost of quality. Sustain covers drift detection, multi year ROI, programme maturity, knowledge retention and diffusion modelling. Most references stop at Control.
Is Tony's Pizza Co. a real business?No. It is a fictitious business created for this toolkit. Any resemblance to an actual pizza shop or restaurant is coincidental. The data is constructed to behave the way real operational data behaves.
Can I use this to train my team?Personal licences cover one reader. For internal distribution, or to teach from this toolkit, contact us for a team or trainer licence.
What format is the download?PDF, formatted for both screen reading and projection. The handbook is A4 portrait with the reference pages placed at print resolution. You receive the download link immediately after purchase.
Are the methods aligned to a certification body?The methods follow Council for Six Sigma Certification standards and standard Lean Six Sigma practice, including the George Group 70 percent rule for goal setting and conventional Kano, QFD, Pareto, Western Electric and Nelson treatments.
Continue your Lean Six Sigma learning
Green Belt online trainingLearn the method behind the formulas Black Belt online trainingAdvanced analytics and project leadership Free Six Sigma calculatorRun the numbers yourself Lean Six Sigma in actionA full DMAIC project walkthrough Lean Six Sigma ebooksMore reference material GlossaryTerms and definitionsStop trusting the button. Understand the formula.
227 formulas. Seven phases. One project. Seven reference decks and a 1,002 page handbook, with every calculation shown from the dataset through to the decision it drove. One purchase, one price.
Get the toolkit, AUD $499 Ask a question