Lean Six Sigma Project Storyboard Toolkit
Lean Six Sigma Project Storyboard Toolkit
Pair it with an online certification course
Lean Six Sigma project storyboard template
Lean Six Sigma Project Storyboard Toolkit
Your project, told from opportunity to sustained result.
A complete Lean Six Sigma project storyboard template set for Yellow, Green and Black Belt. Three Excel workbooks to run the project and one 75 slide PowerPoint deck to present it, with every tool, every tollgate and every sign off in the order a coach reads them.
$499 $999 Save $500AUD · FOUR FILES · ONE PAYMENT
INSTANT DOWNLOAD · 12 MONTHS ACCESS · FULLY EDITABLE
Buy the storyboard set Look inside the files RRecognise DDefine MMeasure AAnalyse IImprove CControl SSustain01 · What downloads
What is in the storyboard template set.
The three Excel workbooks are where you do the work. The single PowerPoint deck is where you present it. They share the RDMAICS spine and nothing else, because calculating and presenting are different jobs.
XLSXThree Excel workbooks
One per belt. The file you work in while the project runs.
201 sheets · 1,214 formulas YBYellow Belt Storyboard
Charter through closure, sized for a first project
55 sheets · 320 formulas GBGreen Belt Storyboard
Adds value stream mapping, MSA, capability and FMEA
71 sheets · 447 formulas BBBlack Belt Storyboard
Adds regression, multi-vari, ANOVA and design of experiments
75 sheets · 447 formulas PPTXOne PowerPoint deck
The file you present from at every tollgate.
75 slides · 16:9 DECKRDMAICS Storyboard Deck
Every tool as a slide, badged YB, GB or BB
7 phase dividers · 7 tollgates02 · The Excel workbooks
XLSX 3 files · 201 tool sheets · 1,214 live formulasThe Excel storyboard template, where the project gets calculated.
One workbook per belt. You type the raw numbers and the sheets do the arithmetic, ranking and plotting. This is the file you work in day to day while the project runs. The sheets below are shown with sample data from a fictitious accounts payable project.
L6SH_BB_Storyboard.xlsx›› SHEET 1 / Project CharterNine linked panels covering problem, goal, scope, business case, metrics, constraints, risks and validated benefit. Sigma Level CalculationEnter units, opportunities and defects. DPU, DPO, DPMO, yield and sigma level return against the conversion table. Pareto AnalysisType a cause and a count. The sheet ranks, sorts, runs the cumulative percentage, flags the vital few and redraws the chart. FMEASeverity, occurrence and detection multiply into RPN, and the highest risk failure modes colour up automatically. Impact vs Effort MatrixScore each solution one to ten. Markers plot themselves into the four quadrants and the shortlist builds itself. Control PlanWhat to monitor, the target, the method, the frequency, the owner and the response when the process moves. Project Results SummaryBefore and after on four measures, key achievements, lessons learnt and a six line sign off block.Use the arrows, the dots, swipe, or the arrow keys
Live calculation
Sigma level, DPMO, capability, RPN, cumulative percentage and weighted scores all recalculate as you type.
Self sorting tables
Pareto ranks causes highest to lowest and flags the vital few. The chart redraws itself.
Automatic plotting
Impact versus effort and the stakeholder grid place their own markers from the scores you enter.
Belt scaled
Yellow Belt 55 sheets, Green Belt 71, Black Belt 75. Same spine, more tools as the belt requires.
Clickable index
Each workbook opens on a navigation sheet. Select a tool name and Excel jumps straight to it.
Unlocked
No protected sheets and no hidden formulas. Rename, extend and rebrand as you need.
03 · The PowerPoint deck
PPTX 1 file · 75 slides · 16:9 · belt badgedThe PowerPoint storyboard template, where the project gets presented.
A separate deck covering the same 75 tools in slide form. This is the file you open in front of a sponsor, a coach or a tollgate panel. No formulas, no cell grid, nothing to project badly on a screen.
LSS_RDMAICS_Storyboard.pptx›› SLIDE 1 / Fishbone DiagramA drawn cause and effect diagram with six branches and an effect box, ready to type into. Impact vs Effort MatrixFour labelled quadrants with numbered markers and a matching shortlist beside them. Project Results SummaryBefore and after on four measures with key achievements, built to close the review.Use the arrows, the dots, swipe, or the arrow keys
Built for a screen
16:9 slides with type sized to read from the back of a meeting room, not spreadsheet cells shrunk to fit.
Belt badges
Every tool slide is marked YB, GB or BB so a candidate knows which slides their belt requires.
Phase dividers
Seven full bleed dividers announce each phase, so a long review has a visible structure.
Tollgate slides
Each phase closes on a checklist slide with reviewer, date and a recorded gate decision.
Drawn diagrams
The fishbone, SIPOC and matrices are drawn shapes you type into, not screenshots.
Your template
Apply your own theme, logo and colours, or keep the Lean 6 Sigma Hub styling as supplied.
04 · Which file, when
They are not the same file in two skins.
The workbooks and the deck do different jobs at different points in the project. Most people run the workbook all the way through, then present from the deck at each tollgate.
Excel workbooks
3 files · 201 sheets
Use it forDoing the work. Entering data, running the numbers, building the evidence. Who touches itThe belt candidate and the project team. Strength1,214 live formulas. Calculated fields move as you type. ScopeThree separate files, one per belt, sized to what that belt needs. OutputA complete, auditable project record a coach can open and check.PowerPoint deck
1 file · 75 slides
Use it forTelling the story. Tollgate reviews, steering meetings, final sign off. Who touches itThe belt candidate, presenting to sponsors and reviewers. StrengthReadable on a screen. Phase dividers and belt badges guide the room. ScopeOne file covering all three belts, with each slide badged YB, GB or BB. OutputA presentation you can walk a panel through without rebuilding anything.05 · The spine
Seven phases. Seven tollgates. Nothing skipped.
RDMAICS puts Recognise at the front and Sustain at the back, because that is where most projects are won and lost. Each phase closes with a checklist and a recorded gate decision: go, go with conditions, no go, or rework.
GATE 01 R RecogniseProve the opportunity is worth running
Find the problem worth solving, confirm it aligns to strategy, secure a sponsor, and score it against the other candidates on the list.
Opportunity AssessmentReadiness and SponsorshipPrioritisationProject Selection MatrixRecognise Tollgate GATE 02 D DefineScope it and get the team aligned
Lock the problem statement, the goal, the boundaries and the metrics, then map the customers, the stakeholders and who does what.
Project CharterSIPOCVoice of the CustomerAffinity DiagramCTQ TreeStakeholder AnalysisRACICommunication PlanDefine Tollgate GATE 03 M MeasureQuantify the current state with data
Agree what you are counting and how, map the process as it runs today, then establish a baseline the sponsor will accept.
Data Collection PlanOperational DefinitionsCurrent State MapValue Stream MapBaseline PerformanceGage R and RProcess CapabilitySigma CalculationMeasure Tollgate GATE 04 A AnalyseFind and validate the real causes
Generate the candidate causes, narrow them to the vital few, then test them against the data rather than against opinion.
Fishbone DiagramCause and Effect MatrixFive WhysTIMWOODSPareto AnalysisFMEAHypothesis TestingRegressionMulti-VariANOVAAnalyse Tollgate GATE 05 I ImproveGenerate, score, pilot, implement
Build the solution set, score it on impact and effort, prove it on a pilot, cost it, then roll it out with a change plan behind it.
Solution GenerationImpact vs EffortPugh MatrixDesign of ExperimentsFuture State MapCost Benefit AnalysisPilot PlanImplementation PlanImprove Tollgate GATE 06 C ControlHold the gains in the process
Hand the improved process to its owner with the monitoring, the response plan and the documentation that keep it from drifting back.
Control PlanSPC ChartsMistake ProofingVisual ManagementSOPs and TrainingBenefits TrackingProject ClosureControl Tollgate GATE 07 S SustainEmbed it and feed the next project
Transfer the knowledge, audit the result at 30, 60 and 90 days, and roll what you learnt into the next opportunity on the list.
Knowledge TransferPerformance ReviewAudit and Compliance30/60/90 Day ReviewCI IntegrationSustain Tollgate CLOSE ✓ ResultsOne page the sponsor can sign
Before and after on four measures, the key achievements, the lessons learnt, and a six line sign off block covering finance and the process owner.
Project Results SummaryFinal Sign-Off06 · Full contents
All 75 Lean Six Sigma tools in the storyboard template.
The full list, nothing hidden behind a scroll bar. The badges show which Excel workbook each tool ships in. The PowerPoint deck carries all 75 as slides with the same belt badges.
General4 tools- 01CoverYBGBBB
- 02RDMAICS OverviewYBGBBB
- 74Project Results SummaryYBGBBB
- 75Thank YouYBGBBB
- 03R Phase IntroYBGBBB
- 04Opportunity AssessmentYBGBBB
- 05Readiness SponsorshipYBGBBB
- 06PrioritisationYBGBBB
- 07Project Selection MatrixYBGBBB
- 08Recognise TollgateYBGBBB
- 09D Phase IntroYBGBBB
- 10Project CharterYBGBBB
- 11SIPOCYBGBBB
- 12Voice of CustomerYBGBBB
- 13Affinity DiagramYBGBBB
- 14CTQ Drilldown TreeYBGBBB
- 15Stakeholder AnalysisYBGBBB
- 16RACI MatrixYBGBBB
- 17Communication PlanYBGBBB
- 18Timeline and TeamYBGBBB
- 19Define TollgateYBGBBB
- 20M Phase IntroYBGBBB
- 21Data Collection PlanYBGBBB
- 22Operational DefinitionsYBGBBB
- 23Current State MapYBGBBB
- 24Value Stream MapYBGBBB
- 25Baseline PerformanceYBGBBB
- 26Measurement System AnalysisYBGBBB
- 27Process CapabilityYBGBBB
- 28Sigma CalculationYBGBBB
- 29Measure TollgateYBGBBB
- 30A Phase IntroYBGBBB
- 31Fishbone DiagramYBGBBB
- 32CE MatrixYBGBBB
- 33Five WhysYBGBBB
- 34Waste Analysis TIMWOODSYBGBBB
- 35Pareto AnalysisYBGBBB
- 36FMEAYBGBBB
- 37Hypothesis TestingYBGBBB
- 38Scatter PlotYBGBBB
- 39Regression AnalysisYBGBBB
- 40Multi-Vari AnalysisYBGBBB
- 41ANOVAYBGBBB
- 42Validated Root CausesYBGBBB
- 43Analyse TollgateYBGBBB
- 44I Phase IntroYBGBBB
- 45Solution GenerationYBGBBB
- 46Impact vs Effort MatrixYBGBBB
- 47Solution Selection PughYBGBBB
- 48Design of ExperimentsYBGBBB
- 49Future State MapYBGBBB
- 50Cost Benefit AnalysisYBGBBB
- 51Solution Risk AssessmentYBGBBB
- 52Pilot PlanYBGBBB
- 53Pilot ResultsYBGBBB
- 54Implementation PlanYBGBBB
- 55Change Management PlanYBGBBB
- 56Improve TollgateYBGBBB
- 57C Phase IntroYBGBBB
- 58Control PlanYBGBBB
- 59SPC ChartsYBGBBB
- 60Mistake ProofingYBGBBB
- 61Visual ManagementYBGBBB
- 62SOPs and Training PlanYBGBBB
- 63Benefits TrackingYBGBBB
- 64Capability Before AfterYBGBBB
- 65Project ClosureYBGBBB
- 66Control TollgateYBGBBB
- 67S Phase IntroYBGBBB
- 68Embed and Knowledge TransferYBGBBB
- 69Performance ReviewYBGBBB
- 70Audit and ComplianceYBGBBB
- 7130-60-90 Day ReviewYBGBBB
- 72CI IntegrationYBGBBB
- 73Sustain TollgateYBGBBB
Yellow Belt 55 tools · Green Belt 71 · Black Belt 75 · PowerPoint deck carries all 75
07 · Inside the workbooks
1,214 live formulas doing the arithmetic.
This section applies to the Excel workbooks only. The PowerPoint deck carries no formulas by design, because a slide that recalculates in front of a panel is a slide that goes wrong.
01Sigma calculator
Enter units, opportunities and defects. DPU, DPO, DPMO, yield and sigma level return against the conversion table.
02Self sorting Pareto
Type causes in any order. The sheet ranks them, runs the cumulative percentage, flags the vital few and redraws the chart.
03Stakeholder quadrants
Score influence and interest. The sheet assigns Manage Closely, Keep Satisfied, Keep Informed or Monitor and plots the position.
04FMEA risk priority
Severity, occurrence and detection multiply into RPN so the highest risk failure modes rise to the top.
05Gage R and R verdict
The measurement system sheet returns an acceptance result rather than leaving you to interpret the percentage.
06Weighted matrices
Project selection, cause and effect, Pugh and risk assessment all total and rank without manual arithmetic.
08 · Who it fits
Who the storyboard template is built for.
- Belt candidates who need a project record a coach and a certifying body will accept
- Practitioners running live improvement work who are tired of rebuilding templates
- Coaches and Master Black Belts reviewing a cohort in one consistent format
- Training providers and internal CI teams standardising across Yellow, Green and Black Belt
09 · Be clear
What it is not.
- Not a statistics package. It structures and records your analysis. Minitab or SigmaXL still handle heavy computation on large datasets.
- Not a training course. It assumes you know what a SIPOC and a control plan are for.
- Not a certification. No exam and no certificate attach to this product.
- Not pre-filled with your data. The sample figures on this page are illustrative. You bring the project.
10 · One price
The complete storyboard template set, sold together.
A Yellow Belt today is a Green Belt next year. The format has to hold across the whole journey, so the set is not split. The launch price runs until 23 September 2026, after which it returns to $999 AUD.
$999 $499 AUD · launch offer · one time payment · 12 months access- Yellow Belt workbook, 55 tool sheets
- Green Belt workbook, 71 tool sheets
- Black Belt workbook, 75 tool sheets
- PowerPoint deck, 75 belt badged slides
- 1,214 live formulas across the workbooks
- Clickable navigation index in each file
- Seven tollgate checklists per workbook
- Unlocked and fully editable
Launch price of $499 AUD until 23 September 2026, then $999 AUD. Prices are in Australian dollars. Digital download, no physical delivery.
11 · Before you buy
Questions people ask.
What is a Lean Six Sigma project storyboard?A project storyboard is the single documented record of an improvement project, from the opportunity that started it through to the result that was sustained. It holds the charter, the baseline data, the root cause analysis, the solution selection, the control plan and the sign off, in phase order, so a coach, a sponsor or a certifying body can follow the reasoning end to end. This toolkit is that storyboard as a ready to fill template, in Excel and PowerPoint, across all three belt levels. Which versions of Excel and PowerPoint do I need?Microsoft Office 2016 or later on Windows or macOS, or Microsoft 365. Google Sheets, Google Slides and LibreOffice will open the files, though some conditional formatting and chart styling may render differently. Are the Excel workbooks and the PowerPoint deck the same thing?No. They cover the same 75 tools but they are built for different jobs. The workbooks hold the live formulas and are where you enter data and run the analysis. The deck has no formulas and is built to be projected at a tollgate review. Most people run the workbook throughout the project and present from the deck at each gate. Can I edit the sheets and slides?Yes. Nothing is locked. Rename sheets, change wording, add rows, insert your own charts and apply your organisation's branding. Can I use these for client work or in my own training?The standard purchase covers use inside your own organisation and on your own projects. To distribute the storyboards to students, clients or a cohort under your own brand, contact us about a trainer licence. Do I need to buy all three belts?The set is sold as one product. The full price is $999 AUD and the launch offer price is $499 AUD. Splitting the belts breaks the point of the format, which is one structure that carries you from Yellow Belt through to Black Belt. Is this accredited?Lean 6 Sigma Hub is accredited by the Council for Six Sigma Certification for belt training. The storyboard set is a documentation tool and carries no exam or certificate of its own. Will it satisfy my certifying body?It captures the artefacts most bodies ask for, including charter, baseline, root cause validation, solution selection, control plan and financial validation. Requirements vary, so check your provider's submission criteria and add anything specific they request. What if the files do not work for me?Contact us within 30 days and we will refund the purchase. Digital files cannot be returned, so the refund is offered on trust.Start today
Open the file. Type your project title. Begin.
A Lean Six Sigma project storyboard template with 201 tool sheets across three belts and 75 presentation slides, structured to RDMAICS, ready for your next project and every one after it.
Buy the storyboard set for $499 AUD